• Completed No. 4 and No. 5 Berths

  • All 56 caissons are installed

  • Shipment of the first caisson

  • The last step of concrete pouring of the 56th caisson

  • First caisson placing

  • Completed oil berth

  • Driving of steel pipe piles at the oil berth