Vice Prime Minister of Serbia Visits E763 Highway Project undertaken by CRBC

On March 1, her Excellency Zorana Mihajlovic - Vice Prime Minister and Minister of the Ministry of Construction, Traffic and Infrastructure of Serbia visited Section Surcin-Obrenovac of E763 Highway Project for inspection and guidance. Among the attendees were his Excellency Li Manchang- Chinese Ambassador to Serbia, Siniša Mali- Mayor of Belgrade City.

The delegation visited the construction site of Crossing-Sava River Bridge, checked the construction of piers for approach and erection of box-girder movable formwork on the south bank, and listened to the brief report made by site management personnel on construction progress and detailed work. Then, Vice Prime Minister Zorana received the interviews by local media. She noted that, commenced on March 1, 2017, Section Surcin-Obrenovac of E763 Highway Project has achieved remarkable achievements within a year, and all the construction links are orderly organized. She spoke highly of all the work made by CRBC.


Prime Minister Zorana Mihajlovic Receives the Interviews by Local Media

Zhang Xiaoyuan- General Manager of CRBC Serbia Branch noted that CRBC always keeps proactive cooperation with the Ministry of Construction, Traffic and Infrastructure of Serbia and Serbia Road Corporation as a reliable contractor, and strives to build Section Surcin-Obrenovac of E763 Highway Project a premium project in the infrastructure construction sector in Serbia.

With a total length of 17.582km, Section Surcin-Obrenovac of E763 Highway Project starts from the north of downtown Belgrade City, and connects E763 Highway under construction crossing the Sava River and Kolubara River. The E763 Highway is set with a total of 11 bridges, including a 1,581m super large bridge crossing the Sava River.