Introduction of Multinational Rwanda-Burundi Road Project LOT4: Mwityazo-Ruvumbu (24.4km)&LOT5: Ruvumbu-Kibuye (41.6km)

10/09/2017

Multinational Rwanda-Burundi Road Project LOT4: Mwityazo-Ruvumbu(24.4km)&LOT5:Ruvumbu-Kibuye (41.6km) is located in NYAMASHEKE City and KARONGI City, which KARONGI City is the capital city of the western province of the Republic of Rwanda.

Alternative North-South Road Project Section Kazarman-Jalal Abad (km291-km433) and Section Balykchy-Aral (km183+500-km195+486) in Kyrgyz

11/19/2015

The Second South-North Highway Project in Kyrgyz is 433km long. The construction will greatly improve the highway network in Kyrgyz, enhance the transportation capability of exporting Chinese materials to the surrounding countries such as Uzbekistan, Tajikistan and Kazakhstan and European regions through the land roads of Kyrgyz, and also will further promote the trade contacts between China and Kyrgyz.

Renovation of Bridges of Seven Roads of the Ministry of Transport, Ecuador

11/19/2015

The Project involves seven sub-projects: PIFO-PAPALLACTA Road Expansion Project (36.34km); SAN VICENTE Municipal Works and Coastal Road Project; LAGO AGRIO AV. QUITO Road Renovation Project (6.27km); SANTO DOMINGO Ring Road Small Bridge and Culvert Renovation Project (8 x bridges and 2 x culverts); PUERTO QUITO Small Bridge Renovation Project (6 x bridges); DÉLEG-BAYANDEL Road Renovation Project (7.46km); HUIGRA-PIEDRERO Road Additional Pavement Project (72.8km).

Odienne-Gbelegban Highway Project in Cote d'Ivoire

11/19/2015

The 70.5km-long project is constructed according to the current French standard. Its construction period in the contract is 24 months. After its completion, it will obviously improve the technical condition of the highway network and the road traffic capacity of the area where the project is, and it is of great significance to enhance the function of the regional highway network in Cote d'Ivoire.

M5 Extension Project in Belarus

11/18/2015

M5/E271 Minsk-Gomel Highway Upgrading and Reconstruction Project Babruysk-Zlobin Section is 77.66km long. Its construction formally started on December 1, 2014, and it is scheduled to be completed and opened to traffic in September, 2016.

Road
  •   10/09/2017

    Introduction of Multinational Rwanda-Burundi Road Project LOT4: Mwityazo-Ruvumbu (24.4km)&LOT5: Ruvumbu-Kibuye (41.6km)

    Multinational Rwanda-Burundi Road Project LOT4: Mwityazo-Ruvumbu(24.4km)&LOT5:Ruvumbu-Kibuye (41.6km) is located in NYAMASHEKE City and KARONGI City, which KARONGI City is the capital city of the western province of the Republic of Rwanda.

  •   11/19/2015

    Alternative North-South Road Project Section Kazarman-Jalal Abad (km291-km433) and Section Balykchy-Aral (km183+500-km195+486) in Kyrgyz

    The Second South-North Highway Project in Kyrgyz is 433km long. The construction will greatly improve the highway network in Kyrgyz, enhance the transportation capability of exporting Chinese materials to the surrounding countries such as Uzbekistan, Tajikistan and Kazakhstan and European regions through the land roads of Kyrgyz, and also will further promote the trade contacts between China and Kyrgyz.

  •   11/19/2015

    Renovation of Bridges of Seven Roads of the Ministry of Transport, Ecuador

    The Project involves seven sub-projects: PIFO-PAPALLACTA Road Expansion Project (36.34km); SAN VICENTE Municipal Works and Coastal Road Project; LAGO AGRIO AV. QUITO Road Renovation Project (6.27km); SANTO DOMINGO Ring Road Small Bridge and Culvert Renovation Project (8 x bridges and 2 x culverts); PUERTO QUITO Small Bridge Renovation Project (6 x bridges); DÉLEG-BAYANDEL Road Renovation Project (7.46km); HUIGRA-PIEDRERO Road Additional Pavement Project (72.8km).

  •   11/19/2015

    Odienne-Gbelegban Highway Project in Cote d'Ivoire

    The 70.5km-long project is constructed according to the current French standard. Its construction period in the contract is 24 months. After its completion, it will obviously improve the technical condition of the highway network and the road traffic capacity of the area where the project is, and it is of great significance to enhance the function of the regional highway network in Cote d'Ivoire.

  •   11/18/2015

    M5 Extension Project in Belarus

    M5/E271 Minsk-Gomel Highway Upgrading and Reconstruction Project Babruysk-Zlobin Section is 77.66km long. Its construction formally started on December 1, 2014, and it is scheduled to be completed and opened to traffic in September, 2016.

  •   11/30/2017

    FM Project in Gabon

    With the overall length of 21.8km and duration of 36 months, the conception and construction project of the link road in Port-Gentil (Forasol-Mbega section) (FM project) is designed with a dual-two lanes road. On February 28, 2016, Gabon’s President personally attended the commencement ceremony. In the late November 2016, the front part of the project with an length of 9.6km, as the main road accessing from Port-Gentil City to the venue to hold the 2017 “African Cup of Nations” was completed on schedule and accepted, providing convenience and easy access for participating teams and fans from all over Africa. On January 9, 2017, under the witness of President Ali Bongo Ondimba, the branch office was awarded Special Contributions to the 2017 “African Cup of Nations” by the Gabonese government.

Total: 82  Head Prev Next Tail   1 / 14  To   GO