President Sassou of Congo-Brazzaville Inspects OYO Inland River Terminal Project
On August 19, President Sassou of Congo-Brazzaville, accompanied by Jean-Jacques Bouya - Minister at the Presidency in charge of affairs of Committee of Territorial Renovation and Large Projects, inspected OYO Inland River Terminal Project which was being constructed by CRBC, and gave instructions.
President Sassou listens to the report on the project construction situation
At the construction site, President Sassou learned and inspected the components of the terminal, asked about the project progress situation of the project in detail, and expressed his satisfaction at the project quality and progress.
OYO Inland River Terminal project under construction
OYO Inland River Terminal project, located on one side of ALIMA River in OYO Downtown of Congo-Brazzaville, consists of passenger terminal, loading terminal, storage site and port roads, housing building, pipe network and electric power project; and the land region area is about 90,000m2. The construction of the project started in August, 2013, and the construction period is 36 months.