Alternative North-South Road Project Section Aral-Kazarman (km195-km291)
Effect picture of the Project
With a total length of about 95.5km, Alternative North-South Road Project Section Aral-Kazarman (km195-km291) connects Aral and Kazarman (main line chainage KM195+500-KM291) involves such works as carriageway pavement, shoulder, sidewalk, bridges, culverts, subgrade, drainage, protection, electric cable, environmental protection, greening, road marks and signs. The Project was commenced on August 10, 2015 and will be completed on April 10, 2020, with the construction duration of 56 months.