Central Land Reclamation Project Phase 3 in Hong Kong

Effect picture of the Project

The project located in Victoria Harbor, between the No.7 Harbor and H.K Convention and Exhibition Center. It was started in Aug. 2003, completed in Dec. 2005, included coastal levee caisson, the prefabrication, transportation and installation of pump house constructed by CRBC (H.K). The whole area of the project occupies 18 ha, and the sea embankment is 1.2km in length.