Mbini Bridge

Mbini Bridge is located at the estuary of Wele River in Central Equatorial Guinea Mainland, and is 53km from Bata, the auxiliary capital of Equatorial Guinea. The starting point of the Bridge connects Bolondo Reconstructed Road on the north bank and current roads of Mbini City on the south bank after crossing WELE River. Its construction started on September 15, 2009, and the construction period is 33 months. In June, 2012, it successfully passed the preliminary acceptance and in October, 2013, it successfully passed the final acceptance. In 2014, Bolond-Mbini Bridge won “CRBC High-quality Project Award” and “CCCC High-quality Project Award” and in 2015, it won “Silver Award of National High-quality (Overseas) Project”.