No.3 Highway Corridor Reconstruction Project in Tajikistan
No. 3 Highway Corridor Project
Funded with the grant from Asian Development Bank (ADB), the Project is a part of Central Asia Regional Economic Cooperation Project in the field of traffic and transportation.
No. 3 Highway Corridor Project is constructed with the grant aid from Asian Development Bank, and it is a part of Central Asia Regional Economic Cooperation (CAREC) program in the transportation field. The project, 57km long, extends to the border of Uzbekistan from Duschanbe - Capital of Tajikistan, and at present, it is the only road which is designed and constructed according to the first-level highway standard in Tajikistan. Its construction started on October 31, 2011 and it was open to traffic on September 18, 2015.