• In 24 October 2015, tunnel Vjeternik of Montenegrin Bar-Boljare highway project started officially, including entrance and subgrade in front of the port. Minister of Transport of Montenegro came to Vjeternik to check construction.

  • In 25 October 2015, tunnel Mrke of Montenegrin Bar-Boljare highway project started officially.

  • Bar-Boljare Highway Project carried out "Safe Production Month" campaign: In response to policy, Bar-Boljare Highway Project carried out "Safe Production Month" campaign in June. The picture shows the mobilization ceremony.

  • Bar-Boljare Highway Project carried out “falling from height emergency drill”. In 27 June 2017, Bar-Boljare Highway Project carried out“falling from height emergency drill” at bridge Moracica.

  • General manager of CRBC Montenegro Hei Shiqiang commanded the emergency drill activity: In the “falling from height emergency drill”, general manager of CRBC Montenegro Hei Shiqiang served as commander.

  • Scene of China-Montenegro Friendly Match among employees

  • Hazardous wastes are collected and disposed by professional company to avoid pollution to the rivers, water sources and soil.

  • Local employees take Chinese lessons with teachers of Confucius Institute, and learn tea arts