• October 23, 2009: Preliminary contract for Zemun-Bolza Bridge and Auxiliary Connecting Line was signed in Serbia

  • April 15, 2010: Commercial contract for Zemun-Bolza Bridge Project was signed

  • June 7, 2011: Wei Jinghua- the then Chinese Ambassador to Serbia and Counselor attended the addressing ceremony of CRBC Serbia Branch

  • January 23, 2012: The First Vice Prime Minister of Serbia (Interior Minister) Daqiqi, Speaker of the City and Walter inspected the Project.

  • March 9, 2012: Bevich- Deputy Mayor of Belgrade City, inspected the Project

  • April 16, 2012: Former Serbian President Tadic and Belgrade’s Mayor Djilas, and CRBC Vice President Hou Jinlong inspected the Project.

  • September 5, 2012: Transport Minister of Serbia Marconi and Belgrade’s Mayor Djilas inspected the Project

  • January 10, 2013 : Serbian Premier Vucic, Speaker Andic and Transport Minister Marconi inspected the Project

  • January 22, 2014: Serbian President Tomislav Nikoli, Transport Minister Marconi and the Chinese Ambassador to Serbia Zhang Wanxue inspected the closure of main bridge.

  • June 13, 2014: Serbian Vice Premier and Transport Minister ZORANA MIHAJLOVIĆ inspected the Project.