With a total length of about 60km, the Project was commenced on April 24, 2002 and completed on November 25, 2003, and its contract duration is 18 months. The Project is funded by the World Bank.
With a total length of 223km, Bishkek-Naryn Road Rehabilitation Project is the most important south-north traffic trunk in Kyrgyzstan, and will further improve the traffic network between China and Kyrgyzstan, significantly accelerating the social stability and economic development of the Republic of Kyrgyzstan.
With a total length of 959km, China-Kyrgyzstan-Uzbekistan Highway starts from Irkeshtm Port in the east, and leads to Tashkent, Capital of Uzbekistan, through Osh, the major city in southern Kyrgyzstan.
With a total length of 129km, Bishkek-Naryn-Torugart Road is located in Ballack City, Issyk-Kul, and is an important tourism and traffic trunk road in Kyrgyzstan.
With a total length of 124km, the Project is an important component for the development of China’s ancient Silk Road, and is of great significance from investment, contract signing to road construction.
With a total length of about 95.5km, Alternative North-South Road Project Section Aral-Kazarman (km195-km291) connects Aral and Kazarman (main line chainage KM195+500-KM291) involves such works as carriageway pavement, shoulder, sidewalk, bridges, culverts, subgrade, drainage, protection, electric cable, environmental protection, greening, road marks and signs.